Restoration

Fyn, Denmark

Borre Fen

Eighty hectares of peatland rewetted alongside a solar build, monitored by a party we do not pay.

A utility-scale solar array running toward distant hills at golden hour
A wooded river valley with turbines standing on the far ridge

Capacity

80 ha

Commissioned

2022

Grid connection

Not applicable

Programme

18 months

Written before planning, not after

The biodiversity plan was drafted before the planning submission rather than as a condition of it, which is the only reason it was affordable. Rewetting eighty hectares alongside the array was cheaper at design stage than retrofitting a single hedgerow would have been at year five.

Three years in

The ecology is ahead of plan. The maintenance cost is double what we budgeted. Both were surprises and only one of them is good news.

What went wrong

Maintenance is running at double the budgeted figure and we have not found a way to bring it down.